Screw a downspout elbow to the outlet tube protruding down from the gutter.
Correct installation of bonding gutter.
Rain gutters should be attached to the fascia and run the entire length of the roof ending with a downspout.
For more information on guttering please visit our website at.
It is also a good idea to use screws to secure the edge tiles making sure the fixings do not penetrate the gutter lining of course.
Measure the length of the roof that you re working on.
Project step by step 20 cutting the gutter.
Snap the sections together.
This can be formed from lead or be a manufactured pre formed product.
Secure the downspout outlet to the gutter with four pop rivets or screws.
Diagram 1 shows a typical bonding gutter detail using a lead lined drainage channel at the junction between the two roof coverings.
Philip dalton explains what bonding gutter is and how it works.
One way to make sure your gutter doesn t fall off the house is to install fascia hanger brackets.
Use a measuring tape to determine the length of the gutter.
Cut a two inch long notch in the front lip of the gutter with tin snips to join a rain gutter section.
With help lift the gutter in place and secure the corner first screwing the bracket into the roof s fascia.
The correct way to weather the junction is to install some form of gutter or channel between the different tiling.
Tip the hooked end of the bracket under the front flange and press the remaining end over the back fo the gutter.
Hold another elbow against the house and cut a piece of downspout to fit between the two elbows.
It s much easier to join sections on the ground than to work from the top of a ladder.
Leave the old spikes in place a spike head looks better than a hole in the gutter.
Use needlenosed pliers to slightly crimp the elbow to fit into the downspout as shown.
Just hook the bracket under the front lip of the gutter and then screw the other side of the bracket to the fascia.